Work Plan (Drafts)
Engineering Drawings (25 June 2005)
Sling Drawings (4 August 2005)
Photos of Fabrication |
|
| 9/28/04 Instrument Shop Electronics Shop |
4/13/05 |
| 10/26/04 Instrument Shop |
|
| 11/2/04 Instrument Shop |
8/15 Prisms being prepared for delivery to LLNL for sol-gel coating |
| 12/3/04 Instrument Shop: Rail, Jack Stand |
8/17/05 Prism handling |
| 12/13/04 Instrument Shop |
10/2-3/05 Prism Installation |
| 1/28/05 Instrument Shop |
|
| 2/3/05 Instrument Shop |
|
| 2/10/05 Optics Shops |
|
| 3/9/05 ADC with Dummy Optics |
|
Project Phases
This site maintained by Deb Culmer, dculmer@ucolick.org
Last updated 30 October 2006