Work Plan

Outline
Budget
Cost Graph
Schedule

Mechanical Drawings (PDF)
Mechanical Report
Assembly Procedure
Prism Installation
Prism Installation Fixture

Electronics


Software

Review Scheduled for Friday, May 21, 2004
10:00-5:00 PDT, 7:00-2:00 HST

Agenda

ADC Detailed Design Review Charter (PDF)

ADC Detailed Design Review Report
v. 1 17 May 2004
v. 2 18 May 2004
v. 3 19 May 2004
v. 4 20 May 2004
v. 5 8 June 2004

ADC DDR Presentation (PDF, Powerpoint) v.2, 5/21

Questions from J. Sebag 5/21

Photo of ADC Forklift 5/21


 

 

 

Last updated 30 October 2006

This site maintained by Deb Culmer, dculmer@ucolick.org

 

 

About ADCMonthly ReportsCurrent DrawingsParticipants

 


Project Phases


Phase A
Preliminary Design

Fabrication and Assembly
Testing
Pre-Ship
Shipping
Installation
Commissioning